ACCOMPLISHED THIS WEEK
- Drywall spackling finished in Connector.
- Road and Parking lot was fine graded in preparation for paving.
- Siding patching and replacement continued.
- Safe framing to be finished and drywalled.
- Rocks removed from vacant lot and area prepped for the election.
- Town Hall was cleaned and voting booths set up for election.
NEXT WEEK
- Town Hall exterior walls to be insulated.
- Parking lot paving.
- Connector drywall to be prime painted.
- Heat to be installed.
SCHEDULED.
- Connector flooring to be rescheduled to week of November 18th