Accomplished weeks of 8/17 and 8/24

The Wilmot Public Works Department has been doing great work preparing the site for a new building to house recycling operations!

  • They cleared trees and removed stumps around the perimeter of the south and west sides of the transfer station to allow for optimal siting of the new building.
  • They dug the hole for the foundation.  The plan, based on core samples, was to dig down to 8 feet in order to hit “virgin soil”, removing all material above this level.  This was sufficient for much of the hole but there was a need to go down to 15 feet in the northwest corner.
  • Staff coordinated with an independent geotechnical engineering firm to confirm the base depth of the hole was appropriate.
  • The hole was filled with rock and dirt (specifically designed for this purpose) to the desired level for the footings and foundation walls.  The independent geotechnical engineering firm tested compaction through the process to insure that the material will support the building foundation.

Next steps: The concrete subcontractor is scheduled to pour footings and foundation walls the week of 9/8/26.

Thanks to PW Director Josh Hatch for taking photos. Thank you to advisory group and community recycling cmte member Dave Nelson for preparing this update! We will continue to provide periodic reports on our progress.